Sacramento Building Permit Office

City of Sacramento Building Division

Active Last verified: 2026-10-03 California
City / County
Sacramento
Jurisdiction
City of Sacramento
Office Hours
Public counter: Monday and Friday 9:00 a.m.-12:00 p.m. by appointment; Tuesday-Thursday 9:00 a.m.-4:00 p.m.
Address
300 Richards Boulevard, 3rd Floor, Sacramento, California, 95811
Google Maps Permit office location

Most building projects inside the City of Sacramento now enter the permit system electronically. For projects that require plan review, the City commonly starts with Planning clearance in the Public Permit Portal; after clearance, a Building Submittal Record is created for electronic plan review by the Building Division.

This routing matters in Sacramento because zoning clearance and building plan review are connected but are not the same approval. New construction, additions, structural remodeling, pools and many other projects move through Electronic Plan Check, while qualifying minor residential work can use a simpler permit route.

Jurisdiction

City of Sacramento or Sacramento County?

Check the property jurisdiction before applying

The City of Sacramento Building Division handles building permits for projects within Sacramento city limits. Unincorporated Sacramento County is a separate permit jurisdiction; those projects are handled by the Sacramento County Building Permits & Inspection Division rather than the City.

A Sacramento mailing address alone does not establish City jurisdiction. Properties outside incorporated city boundaries should be checked before a City permit application is started.

Application Route

Sacramento Planning Clearance Comes Before Many Building Submittals

The City uses two Planning-side application routes that determine how a project reaches Building review.

Planning Permit Application

This route applies when a planning entitlement must be approved before the building permit application can proceed. The required entitlement depends on the proposed land use and development work.

Building Permit Clearance

This route is used when the project does not require a separate Planning Permit but still needs zoning staff to confirm that status before construction plans move to the Building Division.

For most permits requiring building plan review, the applicant first creates the appropriate Planning record through the Public Permit Portal. After Planning clears the project for Building submittal, the system creates a Building Submittal Record (SUB) and sends the next-step instructions by email.

Electronic Plan Check

Plan-Review Projects Are Submitted Electronically

All City building projects that require plan review must use the Electronic Plan Check system. New submittals and resubmittals are made through the Public Permit Portal; the City does not accept paper plans for plan-review submissions.

1

Start the Planning record

Create a Public Permit Portal account and submit either the applicable Planning Permit Application or Building Permit Clearance request.

2

Receive clearance to submit to Building

Planning reviews the project for the required zoning or entitlement path. Once cleared for Building review, the associated Building Submittal Record is created.

3

Upload the EPC package

Construction plans and supporting documents are uploaded to the SUB record following the City’s Electronic Plan Check file and submittal requirements.

4

Complete review and permit issuance

Corrections or resubmittals remain electronic. Applicable permit and review fees must also be resolved before the permit process is completed.

Plan Requirements

Projects That Follow Different Review Paths

Sacramento separates minor work that does not need residential plan review from construction that must be reviewed before permit issuance. Commercial construction generally requires plan review.

Plan review examples
  • Room additions
  • Structural remodels
  • New single-family residences
  • Swimming pools
  • Detached garages
  • Applicable decks and patio covers
  • Sheds or buildings over the City’s plan-review size threshold
Residential minor permit examples
  • Water heater replacement
  • Minor HVAC work
  • Re-roofing
  • Electrical panel changeout
  • Sewer or water replacement
  • Whole-house rewiring or replumbing
  • Window changeout

The exact submittal package depends on the work. Sacramento publishes separate checklists for new residential construction, residential additions and interior remodels, commercial new buildings and additions, commercial tenant improvements, signs, residential photovoltaic systems and other project types.

Applicant Eligibility

Who Can Submit a Sacramento Building Permit Application?

Anyone may submit an application, but California requirements affect who may ultimately receive the permit. Sacramento identifies three principal permit-holder arrangements:

  • Property owner: an owner-builder must complete the City’s required owner-builder verification and satisfy applicable workers’ compensation requirements.
  • Licensed contractor: the contractor must meet the City’s licensing and workers’ compensation documentation requirements.
  • Authorized agent: an agent acting for the owner must provide the required authorization.

Online minor permits have additional limitations. The City’s online minor-permit service is available for qualifying permit types and California licensed contractors.

Inspections

Scheduling Building Inspections in Sacramento

Building inspections can be requested online or through the City’s automated phone system. Requests are accepted 24 hours a day. A request submitted before 6:00 p.m. is scheduled for the following work day; requests made after 6:00 p.m., on weekends or on City holidays are scheduled two working days later.

On the inspection day, the assigned inspector contacts the permit contact by phone to arrange the inspection time. The City’s Inspection Schedule search can also display the scheduled inspection, inspector name, inspector phone number and inspection status.

Virtual inspection rules for certain residential web permits

Since January 12, 2026, Sacramento requires virtual inspections for residential web permits covering Minor HVAC, Minor Water Heater, Solar/PV and EV Chargers. Residential re-roof permits may also qualify for the virtual option.

For ordinary field inspections, approved plans and permit documents must be available, work being inspected must remain uncovered and accessible, and an adult must be present when access to the site is required.

Other Reviews

Building Approval May Involve More Than the Building Division

Planning

Zoning clearance is part of the intake route for most plan-review building permits. Some projects require a separate planning entitlement before Building review can begin.

Fire Prevention

The Sacramento Fire Department reviews and inspects new, repaired or replaced fire-protection systems that require building permits, along with projects involving fire-department access and water supply.

Floodplain Review

Properties affected by Sacramento floodplain requirements can have added development conditions. The City specifically identifies FEMA requirements for new buildings and substantial improvements within the A99 flood zone.

Permit Costs

Sacramento Fees Depend on the Project and Reviewing Agencies

The City does not use one flat building-permit price. Its Building Fees resources organize charges by project type and also provide fee information for common residential minor permits. A preliminary fee estimate can be requested for projects where a broader estimate is needed.

Some charges collected during development are administered outside the Building Division. Depending on the project, these can include Fire Department plan review, regional sanitation, Public Works, water and utilities, transportation, parks or other development-related charges. The City’s fee resources should therefore be checked for the specific project rather than relying on a single permit amount.

Official Resources

Sacramento Permit Links

City Building Division

Building permits and services

City information for permits, plan review, inspections, forms and online building services.

Open Building Division

Application Portal

Public Permit Portal

Submit eligible applications, manage electronic records, schedule inspections and pay available fees.

Open Public Permit Portal

Plan Review

Electronic Plan Check

Review Sacramento’s electronic submission route, plan-review requirements and EPC preparation documents.

View Electronic Plan Check

Planning

Planning permit and Building clearance submission

Explains the difference between a Planning Permit Application and Building Permit Clearance.

View Planning Submission Process

Inspections

Schedule a building inspection

Official scheduling methods, request cutoff times, virtual inspection information and site preparation requirements.

View Inspection Scheduling

Inspection Lookup

Inspection Schedule search

Search by permit number or date for assigned inspector and inspection-status information.

Search Inspection Schedule

Fees

Building Fees

Find project-based fee resources, common minor-permit cost information and preliminary fee-estimate options.

View Building Fees

County Jurisdiction

Unincorporated Sacramento County permits

Use the County Building Permits & Inspection Division for private development projects located in unincorporated Sacramento County.

Open Sacramento County Building Permits