Santa Rosa Building Permit Office
Santa Rosa
City of Santa Rosa
707-543-3200
Building phone hours Monday-Friday 8:00 a.m.-12:00 p.m. and 1:00-4:30 p.m.
100 Santa Rosa Avenue, Room 3, Santa Rosa, California, 95404
For property inside the City of Santa Rosa, California, building permits and building inspections are handled by the Building Division within the City’s Planning and Economic Development Department. The division reviews structural work as well as electrical, mechanical, plumbing, energy and green-building requirements.
Santa Rosa moved its permitting workflow further online in 2026. The City’s enhanced Accela Citizen Access system, launched July 6, 2026, can be used to create permit records, upload plans, respond to review comments, pay fees, track permit status and schedule inspections. Plan files and corrections are managed through the associated Digital Plan Room.
Properties with a Santa Rosa postal address are not necessarily within Santa Rosa city limits. Some nearby parcels are in unincorporated Sonoma County, where Permit Sonoma rather than the City of Santa Rosa is the permit authority. Jurisdiction should be confirmed before starting an application, especially for properties near the city boundary.
City permit or Sonoma County permit?
City of Santa Rosa Building Division
The City reviews building permits for work under its jurisdiction and coordinates building plan review with other City divisions when a project also requires planning, engineering, utilities or other municipal approvals.
Permit Sonoma
Unincorporated Sonoma County uses the County permit system. This distinction can matter even when the postal address says Santa Rosa. Permit Sonoma’s parcel information can identify a parcel as unincorporated county jurisdiction.
Jurisdiction also affects related reviews. A project under City jurisdiction may be routed among Santa Rosa divisions, while an unincorporated project can have a different building, zoning, well, septic, fire and grading path through Sonoma County.
From planning clearance to an issued Santa Rosa building permit
Resolve discretionary planning review when required
Design Review, a Conditional Use Permit, certain sign approvals and other discretionary entitlements generally must be approved before the building permit application is filed. Concurrent review is not automatic; the City states that it must be arranged in advance and approved by the Chief Building Official.
Prepare the project-specific permit package
Santa Rosa publishes different submittal requirements for new residential construction, residential additions and alterations, new nonresidential buildings, commercial alterations and tenant improvements, demolition and other work. The required drawings and supporting documents depend on the permit type rather than a single universal construction checklist.
Create the permit record and upload PDFs
Electronic applications are submitted through Accela Citizen Access. Santa Rosa accepts permit documents in PDF format. Forms and supporting documents are uploaded as separate files, while the drawings are provided as a complete plan set.
Complete plan review and respond through the Digital Plan Room
The City can route an application to the divisions or departments involved in the particular project. Review issues and corrected material are handled electronically. Applicants can see workflow information and assigned review activity through the online permit system.
Clear permit conditions and complete issuance
After plan approval, remaining fees and required issuance documents must be completed. Conditions attached to the project can also have to be satisfied first. Santa Rosa gives encroachment permits and right-of-way dedications as examples of conditions that may prevent building permit issuance until resolved.
Use the approved plans for construction and inspections
Stamped plans and approved supporting documents are made available electronically. Construction is then inspected at the stages required for the issued permit, followed by the applicable final inspections and permit closeout.
Santa Rosa can combine building and trade work in one application
A useful feature of Santa Rosa’s building-permit system is that a single building permit application may cover the building, electrical, mechanical and plumbing work associated with a project. Separate application packages for every trade are therefore not automatically required.
The City normally creates a separate permit for each separate building on a property unless staff determines that one permit is appropriate. Projects involving multiple buildings, addresses or master plans can require specific intake instructions.
Combining building and trade work does not mean every approval is folded into the building permit. Fire-protection systems and other work regulated through Santa Rosa Fire can require separate Fire Department plan review, permits and inspections.
Santa Rosa’s electronic file rules
- Building application records may be created through Accela Citizen Access.
- Electronic submittal files must be PDFs.
- Separate forms and supporting documents should remain separate PDF files rather than being merged into one document.
- Drawings are submitted as a complete plan set.
- Issued-permit revisions must show changed work clearly; Santa Rosa instructs applicants to cloud plan changes, date affected sheets and provide a transmittal describing the revisions.
- Approved plans and permit documents can be downloaded through the online system after issuance.
For an owner-builder application, authorization and owner-builder documents may be required depending on who is acting for the property owner. Santa Rosa also publishes project-specific forms for residential alterations, water-demand issues and other scopes, so the Building Division’s current checklist for the exact permit type should be used.
A building permit does not replace land-use or site approvals
Land use and discretionary entitlements
Planning review determines whether the proposed use and development comply with zoning and other land-use requirements. Santa Rosa’s planning applications include zoning clearance, design review, hillside development, landmark alteration, conditional use permits, variances and other entitlement types.
Work affecting public improvements
Projects involving streets, public right-of-way, utilities, drainage or related improvements can require Engineering review or a separate encroachment permit. Approval of a building plan does not itself authorize construction within the public right-of-way.
Fire protection systems and construction review
Santa Rosa Fire handles fire-construction permits and associated plan review and inspections. Fire sprinkler applications and other regulated fire-protection work can therefore have their own permit record and inspection sequence.
Other agencies can enter the process when the site or scope requires them. For example, Santa Rosa identifies Sonoma County Environmental Health as the agency involved with well and septic systems when applicable. Utility, water-conservation and school-related reviews can also arise from particular development proposals.
Scheduling Santa Rosa building inspections
Building inspections can be scheduled through Santa Rosa’s permit system. The Building Division also operates an automated inspection service: requests can be made by texting MENU to 833-692-5526 or by calling 707-543-3006 and following the prompts. The confirmation number should be retained because it verifies that the inspection request was successfully entered.
The City provides the requester with an inspection window on the morning of the inspection date. Santa Rosa states that requesters can expect a call between 7:30 a.m. and 8:30 a.m. with a two-hour arrival window. The general Building Division inspection information also specifies that advance notice is required and that a specific inspection time cannot simply be selected.
Building Division inspections and Fire Department construction inspections can be separate even when both use City scheduling systems. The permit record and inspection instructions should be checked before requesting an inspection for fire sprinklers, alarms or other Fire Department work.
Changes after Santa Rosa issues the permit
Changes to approved construction documents require Building Division approval. Santa Rosa directs issued-permit revisions into the Digital Plan Room rather than treating altered field drawings as automatically approved work.
- Prepare an electronic version of the proposed revision.
- Cloud the portions of the drawings that changed.
- Date the affected sheets.
- Provide a transmittal identifying the affected pages and describing the changes.
- Wait for review and approval before relying on the revised plans for regulated construction.
Reroof projects involving existing solar panels need additional plan information
Santa Rosa published a policy change effective January 8, 2026 for reroof work involving removal and replacement of photovoltaic panels. The reroof permit application must include a plan showing the panel layout, anchorage spacing and anchorage type or detail even when the panels will return to the same locations.
The City also cautions that roofing and solar work can involve different California contractor-license classifications. When the roofing contractor will also remove and reinstall photovoltaic panels, licensing for the complete scope should be checked before the work proceeds.
Building plan review and permit fees are separate charges
Santa Rosa’s current Planning and Economic Development fee schedule is dated July 1, 2026. Building plan-review fees and building permit fees are separate components, and the schedule includes different tables for new construction, miscellaneous work and mechanical, plumbing and electrical permits.
The amount can depend on the project category, occupancy, size, construction valuation and other applicable City charges. Development projects can also generate planning, engineering, utility, impact or Fire Department fees that are not represented by the base building permit charge alone. The City notes that its development fee schedule can be revised on January 1 and July 1, so current figures should be used rather than older permit estimates.
Santa Rosa permit applications, records and project requirements
Santa Rosa Building Division
Building Division services, inspection information and current permit assistance.
Building Permit Process
City requirements for forms, submittal files, plan review, issuance and related approvals.
Accela Citizen Access
Create permit records, upload plans, manage reviews, pay fees and access online permit services.
Online Permitting System and Digital Plan Room
Instructions for accounts, plan uploads, corrections, revisions, payments and approved plans.
Santa Rosa Permit Search
Search existing Building, Engineering, Fire, Planning and Water permit records by permit information or address.
Planning Application Portal
Zoning clearance, design review, use permits, hillside development, landmark review and other planning applications.
Building Forms
Building applications, authorization forms, submittal requirements and current Building Division documents.
Building Policies and Submittal Requirements
Project-specific requirements, City building policies, special procedures and technical submittal material.
Fire Construction Plan Review and Inspections
Santa Rosa Fire requirements for regulated fire-protection construction, plan review and inspections.
Planning and Economic Development Fee Schedule
The City’s July 1, 2026 fee schedule covering building, planning, engineering and related development charges.
Permit Sonoma
Building and land-use permit services for property in unincorporated Sonoma County.
Permit Sonoma Parcel Search
Useful for confirming whether a Santa Rosa-area property is identified as unincorporated Sonoma County.