Boston Building Permit Office
Boston
City of Boston
617-635-5300
isd@boston.gov
Monday-Friday 8:00 a.m.-4:00 p.m.
1010 Massachusetts Avenue, 5th Floor, Boston, Massachusetts, 02118
Building permits for property inside the City of Boston are issued through the Boston Inspectional Services Department (ISD). Applications are handled by the City rather than a Suffolk County building department. Boston uses separate Short-Form and Long-Form building permits, an online ISD permitting portal, permit-status tracking, zoning review when required, and separate trade permits for electrical, plumbing and gas work.
Boston Uses a City Building Permit System
ISD handles Boston building-permit applications, plan review and building inspections. The City also uses the same online permitting system for several related ISD permits.
Minor alterations and repairs
A Short-Form Permit is intended for minor alterations, repairs or replacements that do not change the structure or use of a building or lot.
The current City fee is $20 plus $10 for each $1,000 of estimated work cost.
Structural work, new construction and use changes
A Long-Form Permit is used for major alterations, structural work and projects that change a building’s use. Boston also places new construction, amendments and certain use-of-premise applications within Long-Form permit categories.
The current City fee is $50 plus $10 for each $1,000 of estimated work cost.
Both permit types are submitted through the ISD online portal. Applicants may visit the ISD office for assistance, but Boston still requires the application itself to be completed through the online system.
From Online Filing to Permit Issuance
Select the correct permit type
Minor work that does not alter structure or use normally falls under Short-Form. Structural alterations, changes of occupancy and new buildings use Long-Form categories.
Create an ISD portal account and submit the application
The application includes the project address, work description, estimated cost and the documents required for the selected filing. Boston advises applicants to have the full submission ready before filing because documents generally cannot be changed or added until ISD begins its review.
Complete City reviews
Depending on the project, the application may move through building, zoning, fire-protection or other City reviews. Additional information or outside-agency approvals can be requested through the portal before issuance.
Wait for the issued permit
Construction should not start while the application remains under review. Boston states that beginning work without the required permit can result in double permit fees or a building-code violation.
Request inspections and close the permit
Required inspections are requested through ISD after issuance. The project should remain open until required inspections have passed and the permit status shows that the application is closed.
Long-Form Applications Require More Project Detail
Boston’s Long-Form application requirements are project- and applicant-specific. For major work, the City identifies documents such as:
- A description of the proposed work and estimated project cost.
- Design plans stamped by a Massachusetts registered architect or engineer.
- A certified plot plan showing property lines and the proposed or existing structure.
- A fire-protection plan and fire-plan narrative when fire-protection work is involved.
- A Massachusetts workers’ compensation affidavit.
- A homeowner waiver when an eligible owner is performing work on an owner-occupied one- or two-family property.
Contractor filings can also require a valid trade or contractor license, current liability insurance, a signed construction contract and Boston construction-safety affidavits. The applicant name must match the licensed contractor when the permit category requires a licensed professional.
Boston allows an owner to apply personally in certain one- or two-family, owner-occupied situations. A condominium owner in a building containing three or more dwelling units must hire a licensed contractor for work covered by these building-permit rules.
A Building Permit May Also Require Boston Zoning Relief
Before planning structural changes, additions, new construction or a change of use, the property can be checked in the City’s Zoning Viewer. The map identifies the zoning district, subdistrict, applicable zoning article, overlays and dimensional rules.
If the proposal complies with the applicable zoning rules, the project can continue as an as-of-right application. When a proposal does not comply, ISD may issue a zoning refusal. The applicant can then seek relief through the Boston Zoning Board of Appeal (ZBA).
A zoning appeal generally begins after ISD issues the refusal letter. Boston requires the appeal to be filed within 45 days of the refusal letter. ZBA proceedings can include a public hearing and neighborhood review before the building permit can continue toward issuance.
Some Projects Need Approval Beyond the Building Review
Boston Landmarks Commission
Projects involving a designated landmark or property in a Boston historic district can require design review by the Boston Landmarks Commission or the applicable historic district commission.
Work near parks and parkways
Boston identifies Parks and Recreation review as a possible outside approval when work is located within 100 feet of a park or parkway.
Boston Fire Department review
Building applications involving fire-protection systems may require fire-protection plans and review. Separate Boston Fire Department Fire Prevention permits, licenses and inspections are handled through the Fire Prevention system rather than being replaced by the building permit.
When an outside approval is required, it appears in the application’s review section. The applicant is responsible for obtaining the approval and uploading the resulting documentation so ISD can continue processing the permit.
A Missing Record of Occupancy Can Hold a Permit
Some Boston properties do not have a Record of Occupancy available in ISD’s records. When the permitting system displays “Please Confirm Occupancy,” that issue must be resolved before the permit can be issued.
The property owner must contact ISD and request a Confirmation of Occupancy inspection. An inspector conducts a walkthrough, and the owner must provide access. A contractor cannot schedule that inspection on the owner’s behalf.
Electrical, Plumbing and Gas Work Use Their Own ISD Permits
A building permit does not replace the trade permits required for regulated electrical, plumbing or gas work. Boston issues these through ISD as separate permit types.
- Electrical permits: limited to licensed electrical contractors.
- Plumbing permits: limited to licensed plumbing contractors.
- Gas permits: required for covered gas lines, appliances and related installations and limited to appropriately licensed contractors.
Homeowners cannot personally apply for Boston electrical or plumbing permits. The licensed contractor performing the regulated trade work must be associated with the permit application.
Boston Inspections Can Be Requested by Phone or Online
Once a permit has been issued and work has reached the required inspection stage, an inspection can be requested through the ISD call center or through the online permitting portal.
Boston asks for the permit number, project address, contact information and the requested inspection. For electrical and plumbing inspections, the contact must be the licensed contractor. Portal users can open the permit’s inspection section and request the applicable inspection type directly.
ISD states that an inspector will contact the listed point of contact within 48 hours to finalize the inspection date. Most construction work requires at least a rough inspection and a final inspection, while larger projects may require additional inspection stages.
Boston states that permitted work must begin within six months after issuance. Certain permits may qualify for a further 180-day extension. After the final required inspection, the permit status should be checked to confirm that the application has been closed.
Boston Permit and Review Links
Boston Permitting
City permit categories, project guidance and links to permit systems.
Inspectional Services Online Portal
Apply for and manage Boston ISD permits.
Boston Permit Finder
Enter an active permit number to check its current status.
Short-Form Permit
Official eligibility, filing documents, fees and inspection instructions for minor work.
Long-Form Permit
Official requirements for structural alterations, new construction and changes of occupancy.
Schedule an ISD Inspection
Boston instructions for requesting inspections by phone or through the permit portal.
Boston Zoning Viewer
Look up zoning districts, subdistricts, overlays and applicable zoning rules by address or parcel.
Zoning Board of Appeal
Official City instructions for filing an appeal after a permit refusal.
Boston Fire Prevention
Fire Prevention permits, licenses, certificates and related inspection services.
Boston Landmarks Commission
Design review information for individual landmarks and Boston historic districts.