Detroit Building Permit Office

City of Detroit Buildings, Safety Engineering, and Environmental Department

Active Last verified: 2026-10-03 Michigan
City / County
Detroit
Jurisdiction
City of Detroit
Office Hours
Construction Inspection: Monday-Thursday 8:00 a.m.-4:30 p.m.
Address
2 Woodward Avenue, 4th Floor, Detroit, Michigan, 48226
Google Maps Permit office location

Construction permits within the City of Detroit are handled by the Buildings, Safety Engineering, and Environmental Department (BSEED). Building, residential, demolition, sign, awning, temporary-use and trade permits are routed through BSEED, while some projects also require zoning, Fire Marshal, water and sewer, public works, health, or other city approvals. Detroit uses the Accela-based eLAPS system for online permit applications, record searches, plan-review activity and inspection scheduling.

Permit routing

Building and residential permits are handled differently

Commercial construction

Commercial Building Permit

BSEED directs commercial building applicants to create an Accela/eLAPS account and submit the permit application online. The city’s commercial permit information states that architectural plans must be sealed by a Michigan-registered architect or engineer.

BSEED’s commercial building permit page lists no contractor-license requirement for the building permit itself. Separate licensing requirements can still apply to electrical, plumbing, mechanical, elevator, boiler and other regulated work.

One- and two-family work

Residential Building Permit

Detroit uses a Residential Building Permit for one- and two-family residential construction. A contractor performing this work must hold the applicable Michigan builder’s license and be registered with the City of Detroit. BSEED also permits qualifying homeowners to obtain their own residential permit without a contractor’s license.

The city provides a separate Residential Building Plan Checklist for drawings and supporting material required for residential plan review.

Online application

Detroit’s eLAPS permit and plan-review workflow

1

Check zoning before finalizing the project

Detroit’s zoning rules affect permitted land uses, building placement and projects that require Site Plan Review or a Conditional Land Use approval. A zoning action may need to be completed as part of the development review before the building permit can move forward.

2

Create an eLAPS account and submit the permit application

The City of Detroit’s Accela portal is used to create permit applications. Contractors should connect their license information to the permit account when the permit type requires a licensed contractor.

3

Upload drawings and supporting documents

BSEED’s August 2025 plan-review instructions direct applicants to open the permit record in eLAPS, select the Plan Review tab and use the Applicant Upload Task to submit drawings and files. This newer workflow places document uploading inside the Accela/eLAPS plan-review process.

4

Follow the plan review in eLAPS

The Plan Review tab displays review progress and reviewer comments. Corrections can be submitted through the permit record when requested. Approved plans and the issued permit are then available through the online process.

5

Complete required inspections

Construction and trade inspections must match the approved plans and applicable codes. BSEED inspections can be scheduled online through the permit system or through the Construction Inspection Division.

6

Close the permit

After required inspections are approved, BSEED issues the applicable final documentation. A Certificate of Acceptance is used to validate completed permitted work. A Certificate of Occupancy is required in circumstances identified by BSEED, including new construction, major renovations, changes of use and establishment of a new use.

Plans and reviews

What BSEED reviews before issuing a permit

Detroit’s Plan Review Division checks permit applications and construction documents against city zoning requirements and the construction codes applicable to the work. The exact documents depend on the permit and project rather than a single citywide checklist.

Commercial plans

Use the commercial checklist

BSEED publishes a Commercial Building Plan Checklist for projects submitted for commercial plan review. Commercial architectural plans are required to be sealed by a Michigan-registered architect or engineer where stated by the city’s permit requirements.

Residential plans

Use the residential checklist

BSEED maintains a separate Residential Building Plan Checklist. Applicants should use that project-specific checklist rather than relying on a generic permit-document list.

Plan review can also involve coordination with other Detroit agencies. BSEED identifies the Detroit Health Department, Detroit Water and Sewerage Department, City Engineering, Traffic Engineering, Planning and Development Department, City Planning Commission and Detroit Fire Marshal among the agencies that may participate when their approval applies to a project.

Zoning

Some projects require a separate zoning action

BSEED’s Zoning Division performs zoning plan reviews, handles Conditional Land Use matters and provides zoning-verification services. Detroit directs applicants to check the Zoning Ordinance to determine whether Site Plan Review applies to a proposed development.

Building approval does not replace every land-use approval

A project requiring Site Plan Review, Special Land Use or another zoning action must follow that process in addition to the construction-permit requirements. Planning and zoning applications are available through the Planning section of Detroit’s Accela/eLAPS portal.

Trade work

Electrical, plumbing and mechanical work can require separate permits

BSEED has separate permitting and inspection functions for building, electrical, plumbing, mechanical, boiler and elevator work. The city’s trade-permit pages identify the applicable license and submission requirements for each trade.

  • Electrical: Detroit requires the applicable electrical licensing for contractor-performed electrical work.
  • Plumbing: Plumbing work is handled through the BSEED plumbing permit and inspection process.
  • Mechanical: Mechanical installations are permitted and inspected as a separate trade.
  • Boilers and elevators: BSEED maintains dedicated permit, licensing and inspection functions for these systems.
  • Homeowners: BSEED states that homeowners may obtain electrical, plumbing or mechanical permits themselves when the required ownership documentation and other permit conditions are satisfied.

Detroit-specific procedure

Fire alarm projects have a coordinated Fire Marshal process

A separate BSEED building permit is not required solely for the fire alarm system when a Detroit Fire Marshal permit has been issued

BSEED’s current Construction Inspection guidance states that Detroit recognizes the Fire Marshal’s permit for the fire alarm system and accepts the Fire Marshal’s final inspection for the required testing and certification. This does not remove electrical, mechanical or other trade-permit requirements that apply to associated installation work.

The Detroit Fire Marshal also performs fire-protection plan review and acceptance testing for applicable systems and participates in review of new construction, changes of use and major commercial renovations.

Inspections

Schedule inspections against the active permit record

Detroit’s Construction Inspection Division performs inspections to confirm that permitted work follows approved plans and applicable construction standards. BSEED identifies six primary construction-inspection trade teams: buildings, electrical, plumbing, mechanical, boilers and elevators.

Permit inspections can be scheduled through the Accela/eLAPS system. BSEED also permits inspection scheduling through its Construction Inspection Division at (313) 224-3202. The correct trade inspection should be selected for the work being inspected.

Final approval does not automatically mean the same closing document for every project. BSEED issues Certificates of Acceptance for completed permitted work and Certificates of Occupancy when occupancy approval is required for the type of construction or use.

Current construction codes

Michigan state codes form part of Detroit’s permit review

Detroit applies Michigan construction codes together with the Detroit Zoning Ordinance and other applicable city requirements. The Michigan Department of Licensing and Regulatory Affairs currently identifies the 2021 Michigan Building Code as the state building code. The 2015 Michigan Residential Code remains in effect while enforcement of the newer residential rules is stayed by court order. Michigan also lists the 2021 Michigan Rehabilitation, Mechanical and Plumbing Codes and the 2023 National Electrical Code among the current statewide construction codes.

Applicants should verify the code edition that applies to the project when plans are prepared, especially where a project crosses building, residential, rehabilitation, energy or trade-code requirements.

Fees

Use Detroit’s current fee schedule for permit pricing

Permit and review fees vary by permit type, project scope and associated reviews. Detroit publishes a BSEED fee schedule and a 2026–2027 Fee Schedule. Projects involving several permits or agency reviews can have separate charges rather than one building-permit fee covering every approval.

Official resources

Detroit permit and inspection links

Department

BSEED

Detroit’s main Buildings, Safety Engineering, and Environmental Department page.

Open BSEED

Application and records

Detroit Accela / eLAPS Portal

Apply for permits, search permit records, access planning applications and schedule supported inspections.

Open the Detroit permit portal

Building permits

Building Permit Requirements

City permit information for commercial, residential and other building-permit categories.

Review Detroit building permits

Plan review

Permits & Plan Review

BSEED’s online application workflow, plan-review information and project checklists.

Open Permits & Plan Review

Residential plans

Residential Building Plan Checklist

Official BSEED checklist for residential plan submissions.

Open the residential checklist

Commercial plans

Commercial Building Plan Checklist

Official BSEED checklist for commercial plan submissions.

Open the commercial checklist

Inspections

Construction Inspection

Inspection scheduling, construction trade information and final certificate procedures.

Open Construction Inspection

Zoning

Zoning / Special Land Use

Site Plan Review, Conditional Land Use and zoning-verification information.

Open Detroit zoning services

Trade permits

Detroit Trade Permits

Permit and licensing requirements for electrical, plumbing, mechanical and related trades.

Review trade permits

Forms

BSEED Forms

Building, sign, trade, occupancy and other BSEED permit forms.

Open BSEED forms

Fees

2026–2027 Fee Schedule

Current City of Detroit fee-schedule resource for applicable permit and review charges.

Open the 2026–2027 fee schedule

Fire review

Detroit Fire Marshal

Fire prevention permits, plan review, inspections and fire-protection system services.

Open Fire Marshal services

State codes

Michigan Construction Code Editions

Michigan LARA’s current list of building, residential, rehabilitation and trade-code editions.

Check Michigan construction codes