St. Louis Building Permit Office

City of St. Louis Building Division - Permits Section

Active Last verified: 2026-10-04 Missouri
City / County
St. Louis
Jurisdiction
City of St. Louis
Office Hours
Monday-Thursday 8:00 a.m.-4:30 p.m.; Friday 8:00 a.m.-4:00 p.m.
Address
1200 Market Street, Room 425, St. Louis, Missouri, 63103
Google Maps Permit office location

Construction permits for property inside the independent City of St. Louis are issued by the City of St. Louis Building Division, not St. Louis County. Building permit applications can be filed through STL City Permits or submitted in person at City Hall. The same application may pass through several City reviews, including zoning and plan examination, before the permit is released.

St. Louis also separates several trade and specialty approvals from the main building permit. Electrical, plumbing, mechanical, fire-system, historic-preservation and right-of-way requirements can therefore affect a project even after the primary building application has been filed.

Jurisdiction

St. Louis City and St. Louis County Are Separate Permit Authorities

The property location matters

The City Building Division issues building permits for projects inside St. Louis City. A mailing address that contains “St. Louis” does not by itself establish City jurisdiction. Property outside the independent city may fall under St. Louis County or another municipality and should be checked with the authority serving that address.

Application

From Building Application to Permit Issuance

1

Prepare the application and plans

The City lists the project address, project plans and the building-permit application fee among the minimum application items. When someone other than the owner of record submits the application, a property-owner authorization letter is also required.

2

Apply online or at City Hall

Building applications may be submitted through STL City Permits or in person at the Permit Section. Online applications allow project files to be uploaded electronically. The City instructs in-person applicants to bring five copies of the plans for review.

3

Complete assigned City reviews

The reviewing offices depend on the project. Building plans are examined for code compliance, while the Zoning Section reviews building permits for compliance with the City’s zoning requirements. Other City offices can become part of the review when the location or scope triggers an additional approval.

4

Pay the permit fee and print the approved permit

For a standard building application, the City collects the application fee when the application is filed. The remaining building-permit fee becomes due after the required approvals are complete and the permit is ready for issuance. The issued permit is to be displayed at the job site during construction.

5

Request required inspections

Registered STL City Permits users can use their account to manage permit applications, communicate with inspectors and request inspections. The City’s portal also provides an address-based contact lookup for finding the building inspector serving a property.

Plans

What the Building Division Expects With an Application

  • Street address of the construction project
  • Building-permit application fee
  • Project plans
  • Property-owner authorization when the applicant is not the owner of record

The amount of plan detail depends on the proposed work. The City’s Plan Exam Section states that major structural changes will, in most cases, require drawings bearing an architect’s or engineer’s seal. Some smaller improvements may be reviewed from simpler drawings, and certain residential work such as decks, porches and room additions may qualify for over-the-counter review at the Plan Exam Hot Spot.

Online and paper plan submissions differ

The City’s building-permit application accepts several common electronic file formats for online plans. An in-person application requires five plan copies for review.

Review Path

Zoning Review Is Part of the St. Louis Building Permit Process

The Building Division’s Zoning Section reviews building permits and commercial occupancy applications against the City zoning code. A proposal may be approved as a permitted use, referred to a Conditional Use hearing, or denied with an appeal route through the Board of Adjustment.

St. Louis also offers a Zoning Only application for projects where zoning feasibility needs to be established before full construction drawings are prepared. If the zoning-only submission is approved, the City states that it can be converted to the full building-permit application rather than requiring a separate new application.

Plan Exam

Construction-code review

Licensed design professionals in the Plan Exam Section review construction drawings against the building codes adopted by the City.

Zoning

Use and zoning review

The Zoning Section determines whether the proposed construction and use comply with the zoning district and any applicable zoning controls.

Trade Work

Electrical, Plumbing and Mechanical Work Can Require Separate Permits

A St. Louis building permit does not automatically cover regulated trade work. When applicable, separate electrical, plumbing and mechanical permits are required. The City’s building application allows associated trade-permit information to be identified during the online application process.

Electrical

Electrical permit

Electrical applications are available through the contractor dashboard in STL City Permits. After approval, the permit can be printed and inspections can be scheduled from the account.

Plumbing

Plumbing permit

Plumbing permits have their own application and review process. The City directs online applications through the STL City Permits contractor dashboard.

Mechanical

Mechanical permit

Mechanical permits may be obtained through the online contractor system or through the Building Division’s Mechanical Section for eligible walk-in applications.

The City states that the appropriate licensed contractor must apply for separate plumbing, mechanical and electrical permits when those permits are required for a building project.

Special Reviews

Projects That Can Trigger More Than Building and Zoning Review

  • Fire alarm and fire suppression: separate permits are required, with certified fire-alarm or sprinkler contractors applying for the applicable work.
  • Tanks and commercial exhaust hoods: the City identifies additional Fire Marshal, Air Pollution or Mechanical approvals for certain installations.
  • Encroachments and certain high-hazard or conditional-use work: Board of Public Service approval may be required before the building permit can be issued.
  • Chapter 99 or Chapter 100 redevelopment areas: the Building Division may require approval from the St. Louis Development Corporation’s Land Clearance for Redevelopment Authority.
  • Work affecting streets or sidewalks: a separate City right-of-way, driveway, excavation or related Streets Department permit may apply depending on the activity.
Historic Properties

Exterior Work in a City Historic District Has an Extra Review Layer

Exterior projects involving a City Landmark or property within a City Historic District are reviewed by the Cultural Resources Office (CRO). The Building Division automatically refers applicable permit applications to CRO when preservation review is required.

This can affect work that might otherwise be treated as routine maintenance under the building code. City historic-district standards can require review for items such as windows, doors, fencing, gutters, repointing and other exterior alterations. Smaller projects may be handled at the CRO Hotspot, while larger proposals or projects that do not meet the applicable district standards may require Preservation Board review.

Historic review can apply even when ordinary building work would not require a permit

Before beginning exterior work on a designated property, check the applicable historic district or landmark requirements rather than relying only on the standard residential building-permit exemptions.

Flood Areas

Flood-Area Projects Have a Separate Development-Permit Rule

The City’s residential permit guidance states that construction in an area designated as a flood area on applicable FEMA floodway or Flood Insurance Rate Maps requires a Floodway Development Permit, even where the proposed work would not otherwise require a building permit under the building code.

Occupancy

Construction Approval and Occupancy Approval Are Not the Same

St. Louis has separate residential and commercial occupancy procedures. Commercial occupancy applications are reviewed by Zoning for the proposed use and are subject to inspections that include building, electrical, mechanical, plumbing and fire review. Residential occupancy is handled through the City’s Housing Conservation Inspection process.

Projects involving a new business, a new use, a change of business or another occupancy change should therefore check the occupancy requirements separately from the construction permit.

Permit Records

Past St. Louis Building Permits Can Be Searched by Address

The City provides an address and parcel search for previously issued building permits. This is useful for checking recorded permit activity for an existing property. Current applicants can also use an STL City Permits account to organize applications and communicate with the inspector assigned to the project.

Official Resources

City of St. Louis Permit Links