Nashville Building Permit Office

Metro Codes and Building Safety

Active Last verified: 2026-10-04 Tennessee
City / County
Nashville
Jurisdiction
Metropolitan Government of Nashville and Davidson County
Office Hours
Monday-Friday 7:30 a.m.-4:00 p.m.
Address
800 President Ronald Reagan Way, 1st Floor, Nashville, Tennessee, 37210
Google Maps Permit office location

Building permits in Nashville are handled through the Metropolitan Government of Nashville and Davidson County Department of Codes and Building Safety. Metro Codes serves as the permitting hub, while zoning, fire, water, stormwater, health, planning, transportation, historic review and other Metro agencies may participate when a project requires their approval. The Zoning Division is normally the first review point for a building permit application.

Jurisdiction

Metro Nashville and Davidson County Permit Authority

Nashville operates under a consolidated metropolitan government, so the building permit process is administered through Metro Codes rather than separate Nashville city and Davidson County building departments. The Department of Codes and Building Safety administers building permits and related trade permits and coordinates permit tracking with other Metro agencies.

Zoning comes first

A proposed project must comply with the zoning applicable to its parcel. After an application is submitted, a Zoning Examiner reviews the proposal and identifies any additional departmental approvals that must be completed before the permit can be issued.

Application workflow

How a Nashville Building Permit Moves Through Review

1

Submit the permit application

Residential and commercial permitting documents may be submitted through the Metro Codes Zoning Help Desk. Registered contractors can also use Nashville’s ePermits system for eligible residential building permits and other online permitting functions.

2

Zoning Examiner review

The application is assigned to a Zoning Examiner. The examiner reviews the proposed use and development against applicable zoning requirements and may request additional information.

3

Complete required Metro signoffs

Depending on the property and scope of work, an application may need review from Metro Water Services, Stormwater, the Health Department, Fire Marshal, Planning, Nashville Department of Transportation, Historic Zoning or another Metro unit. The required reviews are project-specific rather than a fixed list for every permit.

4

Complete plan review and permit issuance

Most commercial projects requiring plan review use Metro’s electronic plan submission process. Once the necessary approvals are complete, Permit Issuance handles matters such as contractor assignment, bond and license review, applicable permit payment and issuance.

5

Schedule inspections and close the permit

The issued permit identifies required inspections. Building and applicable trade inspections must be completed before the project can proceed to final approval. Projects requiring a Use and Occupancy Letter must complete the required building and related inspections before that letter is issued.

Online services

ePermits and Public Permit Status

Contractor access

Online applications and inspections

Registered licensed contractors can use ePermits to perform functions that include applying for eligible building and trade permits, paying permit fees, requesting or scheduling inspections and checking inspection status. Contractors who need an ePermits account must register through Metro Permit Issuance.

Public access

Track an application or issued permit

The public ePermits system can be used to view permit and application information. Permit records can show departmental review status, open review items, staff comments and inspection information. Searches can be made without holding a contractor account.

Commercial ePlans is separate from ePermits

Metro distinguishes its permit tracking system from its electronic plan-review system. A commercial applicant first applies for the building permit and receives a temporary permit application number before uploading plans through the electronic plan-review process. Metro states that most commercial projects requiring plan review must be submitted electronically rather than as paper plans.

Residential permits

Documents Metro Codes May Require for Residential Work

Metro publishes project-specific residential submittal requirements. The documents needed depend on the work being proposed rather than every item applying to every residential project.

  • Residential Permit Application
  • Site plan when required, showing the proposed work, property lines, existing structures and easements
  • Elevations or renderings for projects involving added height or certain new accessory structures
  • Floor plan for work such as additions, detached accessory dwelling units, enclosed accessory structures and applicable interior renovations

A site plan is required for residential construction permits and is also used for additions and new construction to show the proposal in relation to the parcel. Metro’s residential procedures provide more detailed requirements for decks, garages, sheds, pools, DADUs and other accessory work.

Owner permits

Residential Self-Permits

A property owner who currently occupies, or intends to occupy, a single-family residence may qualify to obtain a residential building permit as a self-permit. The owner assumes responsibility for compliance with the applicable zoning, building and trade codes.

Metro requires the applicable self-permit affidavits to be notarized before submission. A self-permit cannot be used for a detached accessory dwelling unit (DADU). Licensed and properly registered contractors may obtain permits within the limits of their licenses.

Commercial permits

Commercial Applications and Electronic Plan Review

Commercial permitting begins with the Commercial Permit Application submitted through the Zoning Help Desk. New commercial construction also requires a site plan. A Zoning Examiner reviews matters such as use, setbacks, building footprint and height under the parcel’s zoning.

Projects that require commercial construction plans proceed through electronic plan review after the permit application has been established. A general contractor does not have to be identified merely to submit the initial commercial application, but the contractor must be established before the building permit is issued.

Trade work

Electrical, Plumbing and Mechanical Permits

Electrical, plumbing, gas/mechanical and applicable low-voltage work require permits and inspections separate from the building permit. Metro allows licensed contractors with ePermits accounts to obtain eligible trade permits online. Applicants who are not licensed contractors or do not have an ePermits account follow Metro Codes’ in-person trade permit procedure.

Electrical

A separate electrical permit and electrical inspections are required when electrical work is part of the project.

Plumbing

Plumbing work is permitted and inspected separately from the primary building permit.

Gas / Mechanical

Gas and mechanical installations follow their own trade permit and inspection process.

Inspections

Requesting Nashville Permit Inspections

Registered licensed contractors can request and schedule inspections through ePermits. Metro also accepts inspection requests by phone. The permit number should be available when scheduling by phone.

  • Building inspections: 615-862-6550
  • Electrical inspections: 615-862-6560
  • Plumbing inspections: 615-862-6570
  • Gas/mechanical inspections: 615-862-6570
  • Fire Marshal inspections: 615-862-5230

Metro lists telephone inspection-request hours as Monday through Friday, 7:30 a.m. to 4:00 p.m. Other project components, including stormwater, water and sewer, urban forestry or transportation work, may have their own inspection contacts.

Final approval

Use and Occupancy

Metro treats the Use and Occupancy Letter as the final stage of applicable building-permit work. Before requesting the letter, the permit record should show the required building inspections, trade inspections and related permits as complete. Permit and inspection status can be checked through ePermits.

For projects requiring a Use and Occupancy Letter, Metro instructs applicants to submit the building permit number and contact information to its Use and Occupancy unit after the required permit conditions have been satisfied.

Official resources

Nashville Permit Links

Metro Codes

Building Permit Process

Metro’s overview of application review, departmental approvals, payment, trade permits and inspections.

View Building Permit Process

Online portal

Nashville ePermits

Permit applications for eligible users, public permit lookup, review status and inspection information.

Open Nashville ePermits

Residential

Residential Building Permit Procedures

Official residential permit requirements, application documents and self-permit rules.

View Residential Permit Procedures

Commercial

Commercial Building Permit Process

Applications, commercial permit types, plan requirements and zoning review information.

View Commercial Permit Process

Plan review

Electronic Plans Review

Instructions for commercial electronic plan submission after the permit application is established.

View Electronic Plan Review

Inspections

Request an Inspection

Official scheduling methods and division-specific inspection contact numbers.

View Inspection Instructions

Zoning

Codes Department Zoning Division

Zoning review information, zoning questions and access to Metro zoning resources.

View Nashville Zoning Information

Trade permits

Electrical, Plumbing and Mechanical Permits

Metro procedures and applications for individual construction trades.

View Trade Permit Information