Austin uses a split permitting workflow rather than routing every project through one online application. Austin Development Services handles the primary building-permit and plan-review functions, while land-use, fire, floodplain, transportation and other reviews may involve separate City work groups. Austin Build + Connect (AB+C) is central to permit management, payments, searches and inspections, but many residential and commercial building applications begin with project-specific City web forms.

Jurisdiction

Confirm Austin Jurisdiction Before Starting an Application

An Austin postal address does not by itself determine which development authority controls a project. City building requirements apply within Austin’s zoning jurisdiction, and City requirements can also extend to certain Municipal Utility Districts when the applicable consent agreement requires City permitting. Some electrical and plumbing work outside the City’s zoning jurisdiction can also fall under City requirements when City utilities serve the property.

Projects in Austin’s extraterritorial jurisdiction can have a different approval path and may require county approvals in addition to City land-development review. The jurisdiction and property status should therefore be established before choosing a building-permit application.

Austin-specific distinction

Building review, zoning review and site-plan review are not interchangeable approvals. A project can satisfy one review while still requiring another before construction permits can move forward.

Application path

Austin Uses Different Intake Routes for Different Permit Types

Residential

Residential Building Plan Review

New construction, additions, interior remodels and demolition involving single-family, duplex and other qualifying residential configurations are handled through Residential Plan Review. New applications are submitted using the applicable residential building-permit web form rather than assuming that AB+C is the initial application form.

Commercial

Commercial Building Plan Review

Commercial construction, commercial remodels, changes of use and qualifying multi-family projects use the Commercial Building Permit Web Form. The applicant also needs an AB+C account because project records, invoices and later permit activity are tied into the City’s online permit system.

Trade and stand-alone work

AB+C May Be the Direct Route

Many stand-alone trade permits can be requested directly through AB+C. Other stand-alone building permits use the City’s designated stand-alone application process. The correct route depends on the work rather than simply whether a contractor already has an AB+C account.

The City’s Types of Permits directory identifies the application method assigned to individual permit categories.

Residential projects

Residential Applications Move From Intake to Activation

1

Select the correct residential application

Residential Plan Review publishes separate application paths for project types such as new construction, additions, interior remodeling, demolition, fences and other residential work. Required plans and exhibits depend on the proposed project.

2

Check existing permit history

Austin instructs residential applicants to resolve expired building and trade permits before moving through the new review. Permit history can be checked through AB+C Public Search.

3

Submit the project through the applicable web form

After the City accepts an application for review, an invoice is issued. Review begins after the required payment is made and the project is distributed to the applicable review disciplines.

4

Respond to plan-review comments

If reviewers identify corrections, Austin issues review comments that must be addressed before approval. Updated documents are submitted through the residential permit modification process, and a complete revised plan set may be required rather than only the changed sheets.

5

Activate permits before construction inspections

Approval of the plans does not by itself complete permit activation. Once required permits are created, the applicable contractor or authorized permit holder must complete the activation process before scheduling construction inspections.

Residential process change

For residential permit applications in October 2026, Austin Energy no longer requires the Building Service Planning Application as part of the residential permit submission process. Electrical-service requirements that apply later in a project remain subject to Austin Energy rules.

Four-unit housing

Four-Unit Projects Can Follow Different Review Divisions

Austin’s treatment of four-unit residential development depends on the building configuration. Four-unit developments within the City are exempt from the site-plan process, but the correct building-review division still matters.

  • Four individual single-family residences, two duplex buildings and certain other detached or semi-detached four-unit configurations can remain under Residential Plan Review.
  • A single fourplex building containing four separate dwelling units is submitted through Commercial Plan Review or the applicable expedited review process.
  • Site-plan exemption does not remove the requirement to obtain the correct building permit.

Commercial projects

Site-Plan Status Is Part of the Commercial Permit Sequence

For most commercial building applications, Austin requires an approved Site Plan, Site Plan Correction or Site Plan Exemption before the building permit is issued. A commercial building and site plan can be reviewed at the same time when the project qualifies for concurrent review and the required concurrent-review request has been approved, but the necessary subdivision or site-plan approval must still be completed before the building plan can receive final approval.

1

Determine site-plan status

Establish whether an approved site plan already covers the proposed work, whether a correction is needed, or whether the work qualifies for a site-plan exemption.

2

Prepare the commercial building application

The application package is based on the project scope and the City’s published commercial submittal requirements. Projects can involve several review disciplines when land use, utilities, fire, accessibility or other regulations apply.

3

Submit the Commercial Building Permit Web Form

The City’s commercial web form accepts new commercial permit applications, revisions and updates. The applicant provides the email associated with the AB+C account so the application can be connected to the City’s permit system.

4

Pay the invoice and complete plan review

After intake accepts the application, the City provides the invoice and document-upload instructions. Payment through the applicable City payment process allows the project to be distributed for review.

October 2026 floodplain change

For commercial remodels and renovations, Austin replaced the former Floodplain Approval Letter used with the Site Plan Exemption process with a Floodplain Supplemental Form. The supplemental form is submitted with the commercial application rather than obtaining the former approval letter in advance.

Online permit system

What Austin Build + Connect Is Used For

AB+C serves as Austin’s online development and permitting account system, but its role changes by permit type. Registered users can perform several permit-management functions, while some initial building applications are submitted through separate City forms.

Registered account

Permit Management

  • Apply directly for permit types offered in the portal
  • Pay permit and review fees
  • Upload project attachments where supported
  • Manage permits connected to the account
  • Schedule eligible building inspections

Public access

Permit and Case Search

AB+C Public Search does not require registration. It can be used to search development cases, permit history and related records, making it useful when checking existing permits before a new application or reviewing the status of a property.

Inspections

Building Inspections Can Be Requested Online or by IVR

Austin allows building inspections to be scheduled through AB+C or through the City’s telephone Interactive Voice Response system. Online scheduling is available only when the AB+C account is linked to the permit, the permit is active and required fees have been paid.

  • The permit holder, general contractor, listed homeowner-contractor, trade contractor or authorized agent can schedule an inspection when properly associated with the permit.
  • AB+C displays inspections available for an active permit and provides scheduling, cancellation and inspection-status functions.
  • Telephone scheduling requires an IVR PIN, the permit number and the applicable inspection code.
  • Austin states that inspections are usually performed about 24 hours after scheduling, although inspector workload can push the inspection to the next business day or as late as 48 hours after the request.

Inspection sequencing remains the responsibility of the permit holder and owner-general contractor. Required inspections vary with the building and trade work authorized by the permit.

Related approvals

A Building Permit May Depend on Other Austin Reviews

Land use

Zoning and Site Plan

Land Use Intake handles applications involving zoning, site plans, subdivisions and related land-development matters. A Site Plan Exemption is a zoning-compliance and small-development review that can be required before a building permit is filed or obtained.

Fire

Austin Fire Plan Review

The Austin Fire Prevention Division reviews applicable site plans, building plans and fire-protection system plans. Review can cover fire access, hydrants, sprinklers, alarms, smoke control, egress, hazardous materials and wildland-urban-interface requirements.

Floodplain

Watershed and Floodplain Requirements

Projects affected by Austin floodplain regulations can require additional documentation or review. Floodplain issues may affect both site development and building-permit processing and should be identified before relying on a standard permit path.

Historic properties

Historic Preservation Review

Permit applications involving historic properties or qualifying demolition work can be routed for Historic Preservation review. Some projects can receive staff-level approval, while others may be referred to the Historic Landmark Commission.

Public right of way

Transportation and Public Works

Construction affecting a driveway, sidewalk, curb, excavation area or other public right of way can require a separate right-of-way permit administered through Austin Transportation and Public Works. A building permit does not replace these approvals.

Utilities

Austin Energy and Austin Water

Utility-related development can require separate coordination with Austin Energy or Austin Water. The applicable utility process depends on matters such as new or changed electrical service, water and wastewater connections, taps and utility infrastructure.

Project closeout

Final Inspection and Certificate of Occupancy

Permit closeout depends on completing the inspections assigned to the project and resolving outstanding permit requirements. For new construction and major renovations that require occupancy approval, the City provides a Certificate of Occupancy after the applicable final inspection requirements have been successfully completed.

A Temporary Certificate of Occupancy has a separate City process for qualifying residential and commercial projects that need limited occupancy, stocking or furnishing before the final Certificate of Occupancy is issued.

Official resources

Austin Permit and Development Links

Department

Austin Development Services

City permit, plan-review, inspection and development-service information.

Open Austin Development Services

Permit directory

Types of Permits

Find the City-designated application route for building, trade, land-use and other permit categories.

View Austin permit types

Online portal

Austin Build + Connect

Portal information for applications supported by AB+C, permit management, payments, attachments, inspections and public searches.

Open AB+C information

Residential

Residential Plan Review

Residential application routes, plan requirements, permit workflow and project-specific review information.

View Residential Plan Review

Commercial

Commercial Plan Review

Commercial building application requirements, site-plan sequencing and commercial review processes.

View Commercial Plan Review

Inspections

Schedule a Building Inspection

Official instructions for scheduling building inspections through AB+C or the City’s IVR system.

View inspection scheduling

Land use

Land Use Assistance

City information for zoning, site plans, subdivisions, site-plan exemptions and related development approvals.

View Land Use Assistance

Fire review

Austin Fire Plan Review

Fire Prevention requirements for applicable building, site and fire-protection system plans.

View Austin Fire Plan Review

Permit exemptions

Work Exempt From Building Permits

Official City list of residential and commercial work that may be exempt from a building permit while remaining subject to applicable codes.

Review permit exemptions

Occupancy

Certificate of Occupancy

City requirements for existing, new and temporary Certificates of Occupancy.

View Certificate of Occupancy information